top of page
Case Study: Rapid Response Mobile Water for Natural Gas Processing
New Mexico
Challenge - A major natural gas processing plant in New Mexico experienced boiler tube failures due to multiple water softener system failures.
Solution - With no capex spending planed, plant trusted BWR to treat variable well water and provide 200 -300 gpm of single pass RO water for low pressure boiler feed water makeup.
Results - BWR responded to the customer’s specific and ever-changing requirements throughout the project, which prevented the facility from losing millions of dollars each day. The plant has operated with 0 down days due to water treatment system upsets or failures for three years all with zero safety incidents.
bottom of page